ক্রমিক |
প্যাকেজ নং |
টেন্ডার নাম |
প্রকারিং এনটিটি |
প্রকাশের তারিখ |
শেষ তারিখ |
বিস্তারিত |
ই-জিপি ওয়েবসাইট লিঙ্ক |
১ |
W-16/2021-2022 |
Construction of O&M Sheds for FRERMIP Embankment Maintenance |
Executive Engineer, Construction Division, FRERMIP, BWDB, Koitola, Bera, Pabna |
০৭-০৫-২০২৩ |
২২-০৫-২০২৩ |
|
|
২ |
W-11/2021-2022 |
Maintenance works (cambering, ghogs, raincut-slope repair, ditch filling, ramp construction etc) for 21.30 km Tranche-1 embankment (3 km in different locations) |
Executive Engineer, Construction Division, FRERMIP, BWDB, Koitola, Bera, Pabna |
০১-০৩-২০২৩ |
৩০-০৩-২০২৩ |
|
|
৩ |
W-06/2021-2022 |
Adaptation works for riverbank protection with geo-textile bags of completed works under JMREMP & Tranche-01 project – (a) 3772 meter at Harirampur upazila of Manikganj district, (b) 2650 meter at Shahzadpur upazila of Sirajganj district, (c) 2159 meter a |
Executive Engineer, Manikganj WD Division, BWDB, Manikganj |
০২-০২-২০২৩ |
০৬-০৩-২০২৩ |
|
|
৪ |
W-05/2021-2022 |
Underwater riverbank protection with geo-textile bags at Harirampur Extension- 4.000 km |
Executive Engineer, Manikganj WD Division, BWDB, Manikganj |
০৭-০৭-২০২২ |
২১-০৮-২০২২ |
|
|
৫ |
C-21 |
Procurement Specialist (National) |
Project Director, Flood and Riverbank Erosion Risk Management Investment Program (Project 2) |
২৪-১০-২০২৪ |
২৩-১১-২০২৪ |
|
|
৬ |
C-19 |
External Monitoring of procurement activities (National) |
Project Director, Flood and Riverbank Erosion Risk Management Investment Program (Project 2) |
১৪-০৬-২০২৪ |
২৩-০৬-২০২৪ |
|
|
৭ |
C-18 |
External monitoring of environmental safeguards (National) |
Project Director, Flood and Riverbank Erosion Risk Management Investment Program (Project 2) |
৩০-০৫-২০২৪ |
০৮-০৬-২০২৪ |
|
|
৮ |
C-17 |
Individual Consultant for External monitoring of social safeguards (National) |
Project Director, Flood and Riverbank Erosion Risk Management Investment Program (Project 2) |
৩০-০৫-২০২৩ |
০৮-০৬-২০২৩ |
|
|
৯ |
C-10 |
Resettlement Solution through NGO |
Project Director, Flood and Riverbank Erosion Risk Management Investment Program (Project 2) |
০৫-০৭-২০২৩ |
১৯-০৭-২০২৩ |
|
|
১০ |
C-08 |
Erosion Prediction along the Jamuna, the Ganges, and the Padma Rivers |
Project Director, Flood and Riverbank Erosion Risk Management Investment Program (Project 2) |
২৪-০১-২০২৩ |
২২-০২-২০২৩ |
|
|
১১ |
C-05 |
River Survey (including bathymetric, ADCP and float tracking) and multi beam echosounder survey and bathymetric survey of the distributaries |
PD, Flood and Riverbank Erosion Risk Management Investment Program (Project 2) |
২৯-০৬-২০২২ |
২৭-০৭-২০২২ |
|
|
১২ |
W-09/2021-2022 |
Emergency works (2.950 km precautionary protective work along the left bank of the Jamuna river adjacent u/s of ongoing work under package W-04 at Hugra-Kakua area) |
Executive Engineer, Tangail WD Division, BWDB, Tangail |
০৬-০৩-২০২৩ |
১০-০৪-২০২৩ |
|
|
১৩ |
W-04/2021-2022 |
Underwater Riverbank Protection at Upstream Chauhali - 8.00 km with geotextile bags including 1.00 km of dredging on the underwater slope |
Executive Engineer, Tangail WD Division, BWDB, Tangail |
১৮-০৭-২০২২ |
১৭-০৮-২০২২ |
|
|
১৪ |
W-03/2021-2022 |
Underwater riverbank protection with geotextile bags at Upstream Chauhali - 7.50 km |
Executive Engineer, Tangail WD Division, BWDB, Tangail |
১৮-০৭-২০২২ |
১৭-০৮-২০২২ |
|
|
১৫ |
W-02/2021-2022 |
Underwater riverbank protection with geo-textile bags at Enayetpur 7.00 km. |
Executive Engineer, Construction Division, FRERMIP, BWDB, Koitola, Bera, Pabna |
১৩-০৭-২০২২ |
১৭-০৮-২০২২ |
|
|
১৬ |
W-01/2021-2022 |
Underwater riverbank protection with geo-textile bags at Benotia-3.500 km. |
Executive Engineer, Construction Division, FRERMIP, BWDB, Koitola, Bera, Pabna |
১৩-০৭-২০২২ |
১৭-০৮-২০২২ |
|
|
১৭ |
W-22/2023-2024 |
Underwater Riverbank Protection with geotextile bags at u/s of Old Dhaleshwari offtake -2.30 km |
Executive Engineer, Tangail WD Division, BWDB, Tangail |
২৫-১০-২০২৩ |
২৩-১১-২০২৩ |
|
|
১৮ |
W-23/2023-2024 |
Underwater Riverbank Protection with geotextile bags at d/s of Salimabad-3.00 km in Nagarpur Upazila (km -9.880 to km -12.880) |
Executive Engineer, Tangail WD Division, BWDB, Tangail |
২৫-১০-২০২৩ |
২৩-১১-২০২৩ |
|
|
১৯ |
W-25/2023-2024 |
Underwater Riverbank Protection with geotextile bags at d/s of Maluchi- 1.00 km (km 4.9 to km 5.9) |
Executive Engineer, Manikganj WD Division, BWDB, Manikganj |
২৫-১০-২০২৩ |
২৩-১১-২০২৩ |
|
|
২০ |
W-24/2023-2024 |
Underwater Riverbank Protection with geotextile bags at d/s of Salimabad- 3.00 km (in between km -12.880 to km -15.800, including 500 meter end termination) |
Executive Engineer, Manikganj WD Division, BWDB, Manikganj |
২৫-১০-২০২৩ |
২৩-১১-২০২৩ |
|
|
২১ |
W-10-a/2021-2022 |
Shajadpur embankment construction from chainage km 21.300 to km 23.830 = 2.530 km |
Executive Engineer, Construction Division, FRERMIP, BWDB, Koitola, Bera, Pabna |
২৫-১০-২০২৩ |
২৩-১১-২০২৩ |
|
|
২২ |
W-26/2023-2024 |
Additional emergency works (to prevent outflanking of W-04 package at Sadar Upazila of Tangail district & to prevent bank erosionat u/s & d/s of existing & ongoing protective works at Belkuchi upazila of Sirajganj district) in C/W Flood and River bank ero |
Executive Engineer, Construction Division, FRERMIP, BWDB, Koitola, Bera, Pabna |
১১-০১-২০২৪ |
১২-০২-২০২৪ |
|
|
২৩ |
W-07/2021-2022 |
Adaptation works for riverbank protection with geo-textile bags of FRERMIP Project-2 & previous works |
Executive Engineer, Construction Division, FRERMIP, BWDB, Koitola, Bera, Pabna |
২৫-১০-২০২৩ |
২৩-১১-২০২৩ |
|
|
২৪ |
W-21/2023-2024 |
Underwater Riverbank Protection with geotextile bags at u/s Enayetpur (Belkuchi)- 3.00 km (km 1.30 to km 4.30) |
Executive Engineer, Construction Division, FRERMIP, BWDB, Koitola, Bera, Pabna |
২৫-১০-২০২৩ |
২৩-১১-২০২৩ |
|
|
২৫ |
G-06/2021-2022 |
PMO-BWDB Office Equipment (Supplying of 3(Three) nos. of Desktop PC, 3(Three) nos. of Desktop All in One PC, 5 (Five) nos. of Laptop (Type-2), 3 (Three) nos. of Laptop (Type-3), 1 (One) no. of Photocopier, 1(One) no. of Printer (Color) and 3(Three) nos. o |
Project Director, FRERMIP (Project-2) |
৩০-০৪-২০২৩ |
১১-০৫-২০২৩ |
|
|
২৬ |
G-01/2020-2021 |
Supply of Geotextile bags for Riverbank Protection Work on the left bank of Jamuna River from km 7.00 to 22.500 (upstream Chauhali) |
Project Director, FRERMIP (Project-2) |
২৯-০৪-২০২১ |
১৭-০৮-২০২১ |
|
|
২৭ |
G-02/2020-2021 |
Supply of Geotextile bags for Riverbank Protection Work on the Right bank of Jamuna River at Enayetpur from km 0.00 to 7.00 and at Benotia from km 0.00 to 3.50 |
Project Director, FRERMIP (Project-2) |
০৭-০৬-২০২১ |
১৮-০৮-২০২৪ |
|
|
২৮ |
G-03/2020-2021 |
Supply of Geotextile bags for Riverbank Protection Work on the Left Bank of Padma River from km 0.00 to 4.00 (Harirumpur Extension) |
Project Director, FRERMIP (Project-2) |
০৭-০৬-২০২১ |
২৩-০৮-২০২১ |
|
|
২৯ |
C-02 |
Community-based Flood Risk Management (CbFRM) Support (including Community Capacity Development Support for Participatory O&M) |
Project Manager, PMU, Department of Disaster Management |
০৪-০৭-২০২৩ |
১৮-০৭-২০২৪ |
|
|
৩০ |
G-04/2020-2021 |
Supply of Geotextile bags for Adaptation Works of completed works under JMREMP & FRERMIP Tranche-1 Project |
Project Director, FRERMIP (Project-2) |
০৭-০৬-২০২১ |
২৪-০৮-২০২১ |
|
|
৩১ |
C-01 |
INSTITUTIONAL STRENTHENING AND PROJECT MANAGEMENT CONSULTANT (ISPMC) |
PD, Flood and Riverbank Erosion Risk Management Investment Program (Project 2) |
২৫-০৫-২০২১ |
২৯-০৬-২০২১ |
|
|
৩২ |
G-05/2020-2021 |
Geotextile Bag Supply for adaptation works of FRERMIP (Project-02) |
Project Director, FRERMIP (Project-2) |
২৫-০৯-২০২৩ |
০৭-১১-২০২৩ |
|
|
৩৩ |
G-13/2023-2024 |
Supply of Geotextile bags for Underwater Riverbank Protection with geotextile bags at d/s of Maluchi (1.00 km) |
Project Director, FRERMIP (Project-2) |
০৫-১২-২০২৩ |
০৪-১২-২০২৩ |
|
|
৩৪ |
G-12/2023-2024 |
Supply of Geotextile bags for underwater Riverbank protection with geotextile bags at d/s of Salimabad- 3.00 km (in between km -12.880 to km -15.800, including 500 meter end termination) |
Project Director, FRERMIP (Project-2) |
০৫-১১-২০২৩ |
০৪-১২-২০২৩ |
|
|
৩৫ |
G-11/2023-2024 |
Supply of Geotextile bags for underwater Riverbank protection with geotextile bags at d/s of Salimabad-3.00 km in Nagarpur Upazila (km -9.880 to km -12.880) |
Project Director, FRERMIP (Project-2) |
০৫-১১-২০২৩ |
০৪-১২-২০২৩ |
|
|
৩৬ |
G-10/2023-2024 |
Supply of Geotextile bags for Underwater Riverbank Protectin with geotextile bags at u/s of Old Dhaleshwari offtake -2.30 km |
Project Director, FRERMIP (Project-2) |
০৫-১১-২০২৩ |
০৪-১২-২০২৩ |
|
|
৩৭ |
G-09/2023-2024 |
Supply of Geotextile bags for Underwater Riverbank Protection at u/s Enayetpur (Belkuchi)-3.00 km (km 1.30 to km 4.30) |
Project Director, FRERMIP (Project-2) |
২৬-১০-২০২৩ |
০৩-১২-২০২৩ |
|
|